SHARE THE BLOG

Friday, 17 June 2011

Six Sigma Methods

Methods


  • DMAIC is used for projects aimed at improving an existing business process.
  • DMADV is used for projects aimed at creating new product or process designs.


DMAIC




The DMAIC project methodology has five phases:

  • Define the problem, the voice of the customer, and the project goals, specifically.
  • Measure key aspects of the current process and collect relevant data.
  • Analyze the data to investigate and verify cause-and-effect relationships. Determine what the relationships are, and attempt to ensure that all factors have been considered. Seek out root cause of the defect under investigation.
  • Improve or optimize the current process based upon data analysis using techniques such as design of experiments, poka yoke or mistake proofing, and standard work to create a new, future state process. Set up pilot runs to establishprocess capability.
  • Control the future state process to ensure that any deviations from target are corrected before they result in defects. Implement control systems such as statistical process control, production boards, and visual workplaces, and continuously monitor the process.



DMADV 




The DMADV project methodology,  features five phases:

for details visit- http://www.mbachannel.blogspot.in/2014/05/six-sigma-methods.html

No comments:

Post a Comment